Mediterranean on the Potomac

We have finished removing the bad soils and we have removed almost
200 dump truck loads of bad dirt and mucky soils. Now you can see where
we have been bringing in the massive amount of stone that we will
use to build the new engineered pad for the new house to sit on.

 100_5216 - Copy 100_5210 - Copy

Here you will see the first phase of the stone placement has been completed and the engineered building pad is well underway. The house will have a swimming pool in the basement and here you can see that we have built the forms for the pool, and we are getting ready to shoot the concrete “gunite” pool.

100_5224 - Copy

Leave a Reply